Hale Wharf Phase 2, London

Project Description:

 

Hale Wharf Phase 2 comprises 8 blocks of different heights and typologies (up to 9 storeys) to provide 201 residential dwellings together with a small area of commercial space and associated external spaces.

The Hale Wharf site is located directly on the River Lea Navigation and is surrounded by water on two sides. 

The construction is traditional in nature with a piled foundation solution, concrete frame and brickwork cladding.

 

Key Challenges:

  • Proximity to the River Lea and River Lea Navigation.

  • Constraints associated with the above plus all construction traffic movements are through Phase 1

  • Slim site thus promoting access and maintenance challenges post construction e.g., MEWP positioning

  • High Rise construction and façade installation.

 

Should you wish to know more about our role on Residential projects, please contact hello@iM2ltd.com

iM2 Role: Principal Designer Advisor

Project Team:

McLaren Construction Group

Allies and Morrison

Ramboll

Hilson Moran

Landscape Projects Ltd

Sector: Residential

Start Date: June 2022

Completion: August 2024

Value: (£) Confidential

Screenshot 2023-01-06 at 13.41.08.png
Screenshot 2023-01-06 at 13.41.18.png
Screenshot 2023-01-06 at 13.41.54.png
Screenshot 2023-01-06 at 13.41.41.png
APS-logo White.jpg
iirsm_main_logo.jpg
iM2 Limited
The Stanley Building
7 Pancras Square
London, N1C 4AG
England, UK
  • X
  • LinkedIn

www.iM2ltd.com

0203 972 4157

CIOB-Logo.jpg
IOSH-Logo.jpg
iM2 LOGO ISSUE A OUTLINES 25-05-20.png
bottom of page