Shell Tower Southbank
Project Description:
The Shell Tower was part of the Shell Centre constructed between 1957 and 1962 and is retained as part of the new Southbank development. The Tower is 27 storeys with two levels of basement and an undercroft below ground.
The project comprised the Internal refurbishment of windows to each floor, Façade clean and roof repairs.
Lift refurbishment, full replacement of Lift 38, upgrade to all other lifts including shaft lighting, new cables, control panels etc. Refresh of internal floor space from level 23-4 in 3 phases. Works to include reconfiguration of office layouts, upgrade mechanical and electrical services, AV, I.T, new gymnasium
And new catering facilities
Key Challenges:
-
Occupied Phased Handover
-
CAT B Fitout
-
Asbestos Remediation
-
Working close to the river in river tunnel
Should you wish to know more about our role on Commmercial projects, please contact hello@iM2ltd.com
iM2 Role: Principal Designer Advisor
Project Team:
Client: Shell
Architect: Perkins & Will
Engineer: AECOM
MEP: AECOM
PC: Overbury
Sector: Commercial
Start Date: June 2016
Completion: On Going
Value: (£) Confidential