Project Description:

 

The Shell Tower was part of the Shell Centre constructed between 1957 and 1962 and is retained as part of the new Southbank development.  The Tower is 27 storeys with two levels of basement and an undercroft below ground.

 

The project comprised the Internal refurbishment of windows to each floor, Façade clean and roof repairs. 

Lift refurbishment, full replacement of Lift 38, upgrade to all other lifts including shaft lighting, new cables, control panels etc. Refresh of internal floor space from level 23-4 in 3 phases. Works to include reconfiguration of office layouts, upgrade mechanical and electrical services, AV, I.T, new gymnasium 

And new catering facilities 

 

Key Challenges:

  • Occupied Phased Handover

  • CAT B Fitout

  • Asbestos Remediation

  • Working close to the river in river tunnel

 

Should you wish to know more about our role on Commmercial projects, please contact hello@iM2ltd.com

iM2 Role: Principal Designer Advisor

Project Team:

Client: Shell

Architect: Perkins & Will

Engineer: AECOM

MEP: AECOM

PC: Overbury

Sector: Commercial

Start Date: June 2016

Completion: On Going

Value: (£) Confidential

Screenshot 2021-09-22 at 17.27.26.png
Screenshot 2021-09-22 at 17.27.45.png
Screenshot 2021-09-22 at 17.27.51.png
Screenshot 2021-09-22 at 17.27.38.png
APS-logo White.jpg
iirsm_main_logo.jpg
iM2 Limited
The Stanley Building
7 Pancras Square
London, N1C 4AG
England, UK
  • X
  • LinkedIn

www.iM2ltd.com

0203 972 4157

CIOB-Logo.jpg
IOSH-Logo.jpg
iM2 LOGO ISSUE A OUTLINES 25-05-20.png
bottom of page