Astra Zeneca Phase 1a Energy & Data Centre
Project Description:
The Energy and Data Centre (E&DC) accommodates the support plant for the new Cambridge site R & D building. The EC has four levels and a basement which house plant facilities and a separate FM area spaced over three levels. The FM area includes an office, an induction room and a number of stores and workshops for equipment maintenance supporting of the R & DC building.
The systems within the energy centre which will feed the services via the tunnel to the R&DC building are as follows:
o Chilled water
o Heating (low grade and high-grade circuits)
o Sprinklers
o Cold water (softened tank cold water and mains water)
o HV electrics
o LV electrics
o Data Centre
Key Challenges:
-
Tunnel under local road to connect to R&DC
-
Complex Plant Replacement of Large Generators
-
Design Risk in BIM
Should you wish to know more about our role on Energy projects, please contact hello@iM2ltd.com
iM2 Role: Principal Designer
Project Team:
Astra Zeneca
Herzog & de Meuron
BDP
Skanska / Mace
Sector: Energy
Start Date: April 2014
Completion: December 2018
Value: (£) Confidential