Project description
The Energy and Data Centre (E&DC) accommodates the support plant for the new Cambridge site R&D building. The E&DC has four levels and a basement which houses plant facilities and a separate FM area spaced over three levels.
The FM area includes an office, an induction room and a number of stores and workshops for equipment maintenance supporting of the R&DC building.
The systems within the energy centre which will feed the services via the tunnel to the R&DC building are as follows:
- Chilled water o Heating (low grade and high-grade circuits)
- Sprinklers o Cold water (softened tank cold water and mains water)
- HV electrics o LV electrics
- Data Centre