GSK Oral Solid Dose Facility

/ Client

GSK plc

/ iM2 Role

Principal Designer

/ Sector

Pharmaceutical

Project description

M2 Build is an Oral Solid Dose facility (OSD), producing tablets and capsules for the GSK brand.

The project was a blend of modular design (DFMA) and traditional ‘stick built’ construction.